White paper WP-041
US Federal PQC Executive Order: Migration Deadlines for Contractors
Federal buyers need verification paths, not slide decks.
At a glance
- Paper
- WP-041
- Topic
- US Federal PQC Executive Order: Migration Deadlines for Contractors
- Format
- PDF + web summary
- Signatures
- ML-DSA-65 post-quantum (NIST FIPS 204)
- Sandbox
- Reproducible at affix-io.com/sandbox
- Company
- AffixIO, Wales, UK
US Federal PQC Executive Order: Migration Deadlines for Contractors is an AffixIO technical paper. Federal buyers need verification paths, not slide decks.
Federal contractors face accelerated PQC migration timelines. This paper maps executive order requirements to verifiable ML-DSA attestation on live API endpoints.
Summary
Federal contractors face accelerated PQC migration timelines. This paper maps executive order requirements to verifiable ML-DSA attestation on live API endpoints.
Download the full PDF for technical detail, diagrams, and reproduction steps. Public sandbox: affix-io.com/sandbox.
Related reading
Frequently asked questions
What is WP-041 about?
Federal contractors face accelerated PQC migration timelines. This paper maps executive order requirements to verifiable ML-DSA attestation on live API endpoints.
How can I test AffixIO before procurement?
Use the live sandbox at https://www.affix-io.com/sandbox/ or follow the evaluation path at https://www.affix-io.com/evaluate.